BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20140930T010000Z
DTEND:20140930T030000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Eastside Transit Corridor Phase 2
DESCRIPTION:The Los Angeles County Metropolitan Transportation Authority (Metro) is happy to announce the release of the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR). As of August 22\, the document is now available for public review and comment.\n\n \n\nA 60-day public review and comment period is now in effect through 5pm on October 21. The environmental document is available for review at multiple locations along the proposed alignments. Public hearings in the cities of Montebello\, Pico Rivera\, South El Monte and Whittier\, preceded by 30 minute open houses prior to each hearing\, have been scheduled and advertised. For additional information on the public hearings and document viewing locations\, and/or to submit written comments\, please visit the project website atwww.metro.net/projects/eastside_phase2
X-ALT-DESC;FMTTYPE=text/html:<span style="color: black\;"><span style="font-size: medium\;"><span style="font-family: calibri\;">The Los Angeles County Metropolitan Transportation Authority (Metro) is happy to announce the release of the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR). As of August 22\, the document is now available for public review and comment.</span></span></span><br />\n&nbsp\;<br />\n<span style="color: black\;"><span style="font-size: medium\;"><span style="font-family: calibri\;">A 60-day public review and comment period is now in effect through 5pm on October 21. The environmental document is available for review at multiple locations along the proposed alignments. Public hearings in the cities of Montebello\, Pico Rivera\, South El Monte and Whittier\,&nbsp\;preceded by 30 minute open houses prior to each hearing\, have been scheduled and advertised. For additional information on the public hearings and document viewing locations\, and/or to submit written comments\, please visit the project website at</span></span><a href="http://www.metro.net/projects/eastside_phase2"><span style="font-size: medium\;"><span style="font-family: calibri\;"><span style="color: rgb(0\, 0\, 255)\;">www.metro.net/projects/eastside_phase2</span></span></span></a></span><br />\n&nbsp\;<br />\n&nbsp\;
LOCATION:Quiet Cannon Banquet Center 901 Via San Clemente Montebello\, CA 90640
UID:e.623.2118
SEQUENCE:3
DTSTAMP:20260408T024654Z
URL:https://business.sfschamber.com/events/details/eastside-transit-corridor-phase-2-09-29-2014-2118
END:VEVENT

END:VCALENDAR
